- Installation of Fire Detection and Protection System at the Peninsula Integrated Power Plant (PIPP), Lekki Phase (2018
- Assembling and coupling of Safeplus (CC-M-VV) RMU and installation inside its indoor metaL enclosure at SPDC K2S Project Site, Kolo Creek, Bayelsa State (Nov. 2017
- Maintenance Inspection and Testing of 20 Cubicles Merlin Gerin Low voltage switchgear – MVBOURBON HIDRA, Onne FLT, Port Harcourt, Rivers State (Aezees Integrated Dynamics, Nov,2016)
- Installation, testing and commissioning of GE Frame 6 GTS2 Generator – Transformer, Protection Scheme and Commissioning of GT2 132KV Bay 4 at Ibom Power Company, Ikot Abasi,Akwa Ibom State
- Fabrication and supply of 20mtr high mast polygon shape lighting poles with supply of other installation materials. Dangote Refinery, Lekki (August 2016)
- Polarity & Turns Ratio Test of 8 CTs, Core excitation Test, Determination of Knee Point Voltage and Magnetizing Current of the CTs at MobilTherm 5KV Switchgear Room within Qua Iboe Terminal (QIT) of Mobil Oron producing Nigeria .2015
- Design, Installation, Testing and Commissioning of all Electrical Services and BOP items for the 10MW Peninsula Integrated Power Project, Lekki, Lagos (PIPP LVI GENCO LTD. 2015)