OUR EXPERIENCE/ TESTIMONY
Installation of Fire Detection and Protection System at the Peninsula Integrated Power Plant (PIPP), Lekki Phase (2018)
Installation, testing and commissioning of GE Frame 6 GTS2 Generator – Transformer, Protection Scheme and Commissioning of GT2 132KV Bay 4 at Ibom Power Company, Ikot Abasi, Akwa Ibom State
Polarity & Turns Ratio Test of 8 CTs, Core excitation Test, Determination of Knee Point Voltage and Magnetizing Current of the CTs at MobilTherm 5KV Switchgear Room within Qua Iboe Terminal (QIT) of Mobil Oron producing Nigeria .2015
Maintenance Inspection and Testing of 20 Cubicles Merlin Gerin Low voltage switchgear – MV BOURBON HIDRA, Onne FLT, Port Harcourt, Rivers State (Aezees Integrated Dynamics, Nov,2016)
Fabrication and supply of 20mtr high mast polygon shape lighting poles with supply of other installation materials. Dangote Refinery, Lekki (August 2016)
Assembling and coupling of Safeplus (CC-M-VV) RMU and installation inside its indoor metal enclosure at SPDC K2S Project Site, Kolo Creek, Bayelsa State (Nov. 2017)
